ipfour
Virtualisation

Do more with less hardware. Virtualise your infrastructure.

Design, deployment, and management of VMware and Hyper-V environments. Consolidate hardware, improve resilience, and reduce costs without sacrificing performance or reliability.

VMware and Hyper-V
High Availability
Hardware Consolidation
UK Engineers
60%
Typical Hardware Reduction
<60s
VM Failover Time
24/7
Host Monitoring
UK-Based
Virtualisation Engineers
What Is Included

Full virtualisation management from design to daily operations.

Whether you are starting fresh or managing an existing virtual environment, we handle every aspect of your virtualisation platform.

VMware vSphere Management

Design, deployment, and ongoing management of VMware vSphere environments. Host configuration, cluster management, and vCenter administration handled by certified engineers.

VMware vSpherevCenterESXi Hosts

Hyper-V Management

Full management of Microsoft Hyper-V environments including host configuration, VM provisioning, live migration, and integration with Windows Server infrastructure.

Hyper-VWindows ServerLive Migration

Hardware Consolidation

Reduce your physical server footprint by consolidating workloads onto fewer, more powerful hosts. Lower power, cooling, and maintenance costs without sacrificing performance.

Server ConsolidationCost ReductionPower Savings

High Availability and Failover

Configure HA clusters and failover policies so virtual machines restart automatically on surviving hosts if a physical server fails. Downtime measured in seconds, not hours.

High AvailabilityAutomatic FailoverCluster Management

Resource Optimisation

Continuous monitoring of CPU, memory, and storage allocation across all virtual machines. Right-sizing recommendations prevent resource contention and waste.

Resource MonitoringRight-SizingPerformance Tuning

VM Lifecycle Management

Provisioning, snapshotting, cloning, and decommissioning of virtual machines managed to a consistent standard. Templates maintained for rapid deployment.

VM ProvisioningSnapshotsTemplates
How We Work

From assessment to managed platform with minimal disruption.

A structured delivery process that gets your virtualisation platform live and under management without impacting your business.

01

Environment Assessment

We assess your current physical infrastructure, workloads, and performance requirements to design the right virtualisation architecture.

02

Architecture Design

Host sizing, cluster design, storage configuration, and network layout documented and agreed before any work begins.

03

Platform Deployment

Hypervisor installation, cluster configuration, and management tooling deployed to your agreed design specification.

04

Workload Migration

Physical-to-virtual or virtual-to-virtual migrations completed with minimal downtime. Each workload tested post-migration before sign-off.

05

HA and Monitoring

High availability policies configured. Monitoring agents deployed across all hosts and VMs. Alert thresholds set and tested.

06

Ongoing Management

Day-to-day VM management, patching, capacity monitoring, and incident response. Quarterly reviews with your account manager.

Real Results

How UK businesses have transformed their infrastructure with virtualisation.

Logistics Company, Midlands

A 200-person logistics firm was running 14 ageing physical servers. Hardware failures were causing regular downtime and the cost of replacing individual servers was unsustainable.

Virtualisation project reduced physical servers from 14 to 4. Hardware costs cut by 60 percent. HA cluster means any single host failure causes zero downtime.

Accountancy Practice, Manchester

A growing accountancy firm needed to scale their server capacity quickly for a new client management system but had no physical rack space or budget for new hardware.

Existing VMware environment right-sized to free up capacity. New workload deployed as a VM within 4 hours. No new hardware required.

Education Provider, Yorkshire

A training provider needed to demonstrate resilience and disaster recovery capability for an Ofsted inspection. Their single physical server was a critical single point of failure.

Two-host Hyper-V cluster deployed. Automatic failover tested and documented. Ofsted inspection passed with infrastructure resilience evidenced.

Get Started

Ready to consolidate your servers and cut infrastructure costs?

Our free virtualisation assessment identifies consolidation opportunities and designs the right architecture for your workloads and budget.